Back to Queen Creek

Queen Creek allocates $5 million for quick-impact traffic fixes

The Town of Queen Creek has designated $5 million in its current budget for 20 smaller transportation projects aimed at reducing delays and improving flow across the community.

Pierce Keller

September 24, 20262 min read

Queen Creek traffic - illustration, Jake Team LLC

The Town of Queen Creek is advancing a plan to implement 20 targeted infrastructure improvements designed to ease traffic congestion and address specific roadway delays. These initiatives are part of a broader strategy that includes both immediate fixes and long-term expansion efforts.

A new allocation of $5 million within the current fiscal year budget is dedicated exclusively to these high-impact projects. Town officials note that such smaller interventions can be executed more rapidly than major capital developments, which often require years of planning and construction. The specific sites for these improvements were selected based on staff assessments of the roadway network and input from local residents.

Mohamed Youssef, the town’s transportation director, emphasized the necessity of balancing long-term infrastructure growth with immediate community needs. He stated that these targeted updates complement larger capital projects by providing meaningful benefits to daily commutes throughout Queen Creek.

Previous fiscal year efforts included the addition of dedicated right-turn lanes at several key intersections, including Queen Creek Road and Ellsworth Loop Road, as well as Walnut Road and Ellsworth Loop Road. The current list of 20 potential projects for Fiscal Year 2026-27 encompasses a variety of work types, such as restriping, extending turn lanes, modifying medians, adding pavement, and constructing a roundabout.

The proposed improvements are categorized into three tiers based on evaluation factors like cost, location, and the specific traffic issues they address. Tier I projects focus on lane additions and capacity increases at locations including Grange Parkway west of Gary Road, Germann Road at Rittenhouse Road, and Meridian Road north of both Ocotillo and Queen Creek Roads.

Tier II initiatives involve restriping intersections to adjust turn lane configurations or signal operations. Specific examples include changes at Sossaman Road at Riggs Road, Ellsworth Road at Empire Boulevard, and Gary Road at Grange Parkway. These projects aim to optimize traffic flow by converting protected signals to permissive ones or extending left-turn capacity through median modifications.

Tier III proposals include more complex structural changes, such as modifying concrete medians on Ellsworth Loop Road at Queen Creek Road to create dual left-turn lanes. Additional details regarding the remaining projects in this tier were not fully provided in the source material.

Over the last decade, Queen Creek has invested more than $200 million in its transportation network, which now comprises over 900 lane miles and 90 traffic signals. The current Capital Improvement Program budget includes more than $71 million for larger transportation projects identified through the town’s Transportation Master Plan.

Source: Signals AZ.

Sources

signalsaz.com

Share

Pierce Keller

Pierce Keller writes about community life, schools, public safety, and local events in Queen Creek.

Related Stories

More in Arizona